At a Cannington, our team performed a comprehensive soakwell pump out and stormwater jetting operation. The work involved removing accumulated water and debris from soakwells and clearing blocked stormwater drains to prevent flooding. Careful coordination and planning ensured minimal disruption to daily carpark use while maintaining the safety of pedestrians and vehicles. This service improved drainage efficiency and contributed to the long-term reliability of the carpark’s water management system.